Gold Point : Overview

The Company holds a 100% interest in the unpatented claims of the Gold Point Property located in Sierra County, California.  Prospecting began in the project area during the early 1900’s while ore production from the Gold Point vein reportedly began in 1918.  According to the California State Mining Report of April 1923, “the mine was processing 60 to 75 tons per day with the ore averaging 0.5 opt gold.”  It is estimated that approximately 100,000 tons of ore were mined through 1948 averaging about 0.30 opt gold.

From 1984 to 1990 over $1.5 million was spent on the Gold Point project on underground mine rehabilitation, more than 10,000 feet of diamond drilling and 500 feet of drifting.  The majority of this work was conducted by Sierra Gold Development Inc., a subsidiary of Battle Mountain Gold Company.  However, Battle Mountain relinquished the property as it no longer met the Company’s criteria. 

Battle Mountain completed approximately 40 diamond drill holes from different “stations” to cross cut the vein at various locations for delineating mineral resources.  Eight core holes were drilled from station #3 and seven encountered anomalous gold mineralization.  Intercepts ranged from 8.48 feet of 0.081 opt gold to 5.39 feet of 1.212 opt gold.  Exploration and development drilling indicated that the Gold Point vein is completely open down dip and that strike potential also remains. 

Current Teras Stock Price
Last Trade 0.14 (+0.00)
10:20am, 5/23/2017
View Detailed Stock Information

Current Gold Price $CAD

Current Gold Price in $CDN

Teras News

April 20, 2017
Teras Reports Positive Results On Its Cahuilla Gold Project

More Details

April 11, 2017
Teras Provides Shareholders With Project Updates

More Details

November 18, 2016
Teras Reports Positive Results From Its Recent Sampling Program

More Details

October 6, 2016
Teras Prepares Cahuilla Project For Expansion

More Details

September 29, 2016
Teras Retains RED CLOUD As Strategic / Capital Markets Advisor

More Details

May 19, 2016
Teras Significantly Advances Cahuilla With Technical Studies Update

More Details